STRUCTURAL INTEGRITY ASSESSMENT · MINES & HEAVY INDUSTRY

SR2 Bucketwheel Assessment

Dalrymple Bay Coal Terminal · Queensland, Australia

THE CHALLENGE

Keeping critical assets safe — and operating.

When DBCT needed certainty about the structural integrity of their SR2 bucketwheel reclaimer — a critical production asset showing significant corrosion — BIA delivered an independent review that gave operators the confidence to continue safe production while a targeted repair plan was put in place.

Von-Mises stress envelope across all 40 load cases — stresses remain within allowable limits throughout the structure.

THE SOLUTION

What BIA delivered:

  • Independent FEA Review
    Validated modelling methodology, load assumptions, and structural compliance against AS4324.1 — confirming the asset was fit for continued operation.
  • Risk-Informed Advice
    Identified the only credible structural risk — localised fatigue at corrosion-through holes — and provided a clear, practical remediation strategy.
  • Operational Certainty
    Gave the client confidence to maintain production safely, avoiding unnecessary shutdown and supporting informed capital investment decisions.

Expertise Applied

Structural Integrity    |    FEA Review
Mines & Heavy Industry   |    AS4324.1

Related Capabilities

  • Structural integrity assessment
  • Independent FEA review
  • Life extension strategies
  • Asset management & decision support
  • Maintenance & remediation planning

Engineering for tomorrow

OFFICES

Brisbane (HO)
Level 1/470, St Pauls Tce
Fortitude Valley QLD 4006

Melbourne
4/14 St Andrews St
Brighton VIC 3186

Mackay
Glenoak Ave
Richmond QLD 4740